
04 · Service
Emergency power
Emergency power is a sequence, not a piece of equipment. We own the pad, the gear, the ATS, and the test.
Hospitals, labs, and mission-critical floors need a contractor who has done a load-bank test and written the report. Golden Pear Electric installs standby diesel and gas generators, automatic transfer switches, and paralleling gear.
We coordinate with the mechanical contractor on exhaust and fuel, and we do not leave until the weekly exercise actually exercises.
Put this on a bid.
Send the set and the due date. We confirm the same day if we can staff it.